Foundation Stone Laying Ceremony of B.Grimm Power (Angthong) 2 and 3 Power Plants

Dr.Harald Link, President of B.Grimm Power and Dr. Chayanin Debhakam, Chairperson of the Singha Estate executive committee, held the foundation stone laying ceremony for B.Grimm Power (Angthong) 2 and 3 at the S Angthong Industrial Estate located in Angthong province. These two power plants have a combined generating capacity of 280 MW and feature cutting-edge technologies that allow them to yield more electrical output than conventional systems. Not only is this technology high production capacity and low carbon emission, and helps reduce global warming, but it is also uplifting S Angthong industrial estate. These plants are scheduled to start commercial operations in early 2023.