Domestic Projects

B.Grimm Power (AIE-MTP) Limited

Project In Operation
Plant Type Combined Cycle Co-generation
Electricity Capacity 124 MW
Location WHA Eastern Industrial Estate (Map Ta Put)

* 124 MW installed capacity will be replaced with 140 MW installed capacity under the replacement scheme after existing PPA with EGAT expired.